Our Projects

Extension to Toyota Service Centre at Arad

Client :
E.K Kanoo
consultant :
Aref Sadeq Design Consultants
Scope :
construction of 20 steel columns and 21 RCC columns buildings with fire fighting , CCTV, access control, intruder sytem, fire alarm, smoke extract system, hig speed rolling shutters, gravity fans for roof, sun pipe dooms, etc
Time Schedule :
2014-2015

Extension to Lexus Service Centre at Arad

Client :
E.K Kanoo
consultant :
Aref Sadeq Design Consultants
Scope :
Construction of parking building with ground floor , mezzanine floor and 5 more floors of 765 m2 each with 2 car lifts, fire fighting, CCTV, access control system, intruder system, fire alarm, smoke extraction, RO plant, high speed rolling shutters, roof fans, sun domes, plus modification existing Lexus Service Centre
Time Schedule :
2014-2016

Construction of tyre warehouses at Salmabad

Client :
E.K Kanoo
consultant :
Design House
Scope :
Construction of 2 main building (6750m2 and 2100m2) and additional buildings including all internal and external works like filling, sub structure works, supply and erection of PEB super structures with side block walls, external cladding, plumbing, drainage, electrical, firefighting works and HVAC works etc
Time Schedule :
2015-2016

Construction of 25 Houses at Samaheej Village and 36 Houses at Arad

Client :
Ministry of Housing
consultant :
Ministry of Housing
Scope :
construct 25 hoses type T3M in Samaheej and T8 in Arad-from foundation to finishing. One house built up area is 208 m2 on a plot area 242 m2 in Arad
Time Schedule :
2012-2013 and 2014-2015

A'ali Sewerage Scheme- Blocks 746 & 748

Client :
Ministry of Works
consultant :
Ministry of Works
Scope :
construction of a sewerage network system comprising of 7.60km Main lines with average depth of 8m, 4.54km Laterals, 703 Manholes & Chambers, 2 Minor Lifting Stations and 372 House Connections. The range of pipe sizes is from 150mm to 500mm.
Time Schedule :
2013-2016

Nabih Saleh Sewerage and Storm Drainage Schemes

Client :
Ministry of Works
consultant :
MWH Khonji
Scope :
construction of a sewerage and storm drainage schemes with 5.3km Main lines , 6.4km Lateral, 1 Major Pumping Station, 2km Treated Sewage Effluent (TSE) and 400 House Connections. The storm drainage with 10.7 km lines, pipe sizes 150mm to 700mm.
Time Schedule :
2011- 2016

Al Madina Al Shamaliya- Island 13 - Construction of Infra structure Civil & Building works

Client :
Ministry of Housing
consultant :
Cebarco
Scope :
All infrastructure Civil and building works including road works, street lighting, 11kv Power supply, low voltage power supply, storm water system, foul sewerage system, potable water supply, treated sewage efluent (TSE)/ irrigation system and telecom networks
Time Schedule
2015-2016

Karranah Sewerage Scheme Blocks 746 & 460

Client :
Ministry of Works
consultant :
Ministry of Works
Scope :
construction of a sewerage network with 6.7 km lines, 425 Manholes & Chambers, reconstruction of 1 Lifting Station and 2 Pumping Stations and 350 House Connections plus 50m micro tunneling . Pipe sizes from 150mm to 500mm.
Time Schedule
2012-2015

Improvement of Salman Ahmed Al-Fateh highway in Sitra

Client :
Ministry of Works
consultant :
Ministry of Works
Scope :
Asphalt laying, paving bricks laying, storm water drainages, installation of crash barriers, kerbing, duct works, traffic signal works, road marking, removing and rerouting of existing cables, and services
Time Schedule
2012-2014

Bridge Maintenance

Client :
Ministry of Works
consultant :
Ministry of Works
Scope :
General Maintenance of bridges, culverts, drainage, channels, bridge parapet sections, signs gantries. It involves partial demolition and repair works of concrete head walls, piers, deck-slabs and wing walls, crack injection repair to existing concrete structure, protective coating to concrete surfaces, embankment protection with stone pitching…
Time Schedule
2014-2016