Our Projects

Extension to Toyota Service Centre at Arad

Client :
E.K Kanoo
consultant :
Aref Sadeq Design Consultants
Scope :
construction of 20 steel columns and 21 RCC columns buildings with fire fighting , CCTV, access control, intruder sytem, fire alarm, smoke extract system, hig speed rolling shutters, gravity fans for roof, sun pipe dooms, etc
Time Schedule :
2014-2015

Fives Gas Treatment Centre for Aluminium Bahrain

Client :
Fives Solios, France
Final User :
Aluminium Bahrain
Scope :
Fabrication and delivery of ducts and supports including reinforcement in existing ducting and stack for boosting of Fives GTC 4 at Alba smelter
Time Schedule
2014

Extension to Lexus Service Centre at Arad

Client :
E.K Kanoo
consultant :
Aref Sadeq Design Consultants
Scope :
Construction of parking building with ground floor , mezzanine floor and 5 more floors of 765 m2 each with 2 car lifts, fire fighting, CCTV, access control system, intruder system, fire alarm, smoke extraction, RO plant, high speed rolling shutters, roof fans, sun domes, plus modification existing Lexus Service Centre
Time Schedule :
2014-2016

Construction of tyre warehouses at Salmabad

Client :
E.K Kanoo
consultant :
Design House
Scope :
Construction of 2 main building (6750m2 and 2100m2) and additional buildings including all internal and external works like filling, sub structure works, supply and erection of PEB super structures with side block walls, external cladding, plumbing, drainage, electrical, firefighting works and HVAC works etc
Time Schedule :
2015-2016

Fives structures and ducts for Qatar National Cement in Um Bab, Qatar

Client :
Fives FCB, France
Final User :
Qatar National Cement
Scope :
Fabrication and delivery of 1 100 tons of structural steel and 200 tons of process ducts for the Line 4 of the QNC cement plant in Um Bab, Qatar
Time Schedule
2015 - 2016

Construction of 25 Houses at Samaheej Village and 36 Houses at Arad

Client :
Ministry of Housing
consultant :
Ministry of Housing
Scope :
construct 25 hoses type T3M in Samaheej and T8 in Arad-from foundation to finishing. One house built up area is 208 m2 on a plot area 242 m2 in Arad
Time Schedule :
2012-2013 and 2014-2015

Fabrication and supply of Quick release clamps

Client :
REEL , France (IMECA Off-Shore Division)
Final User :
Technip Subsea in UAE for subsea activities in the Gulf
Scope :
Fabrication, assembly together with imported components and factory testing of 10 quick release clamps
Time Schedule
2015

A'ali Sewerage Scheme- Blocks 746 & 748

Client :
Ministry of Works
consultant :
Ministry of Works
Scope :
construction of a sewerage network system comprising of 7.60km Main lines with average depth of 8m, 4.54km Laterals, 703 Manholes & Chambers, 2 Minor Lifting Stations and 372 House Connections. The range of pipe sizes is from 150mm to 500mm.
Time Schedule :
2013-2016

Structural steel for REEL aircrafts docking systems.

Client :
REEL, France (Aeronautic Division)
Final User :
Oman Air, Muscat in Oman
Scope :
Fabrication and delivery of structural steel for nose dock, pax door, fuselage and platform for REEL docking systems + Similar jobs delivered for Reel projects for Qatar Airways and Kuwait Amiri Fleet.
Time Schedule
2016

Nabih Saleh Sewerage and Storm Drainage Schemes

Client :
Ministry of Works
consultant :
MWH Khonji
Scope :
construction of a sewerage and storm drainage schemes with 5.3km Main lines , 6.4km Lateral, 1 Major Pumping Station, 2km Treated Sewage Effluent (TSE) and 400 House Connections. The storm drainage with 10.7 km lines, pipe sizes 150mm to 700mm.
Time Schedule :
2011- 2016

Structural Steel for Toyota Service Centre at Arad, Bahrain.

Client :
E.K Kanoo
Final User :
Toyota Service Centre (E.K Kanoo group)
Scope :
Supply, fabrication, painting including fire protection coating, delivery and erection of 150 tons of structural steel for Toyota Service Center at Arad
Time Schedule
2014

Al Madina Al Shamaliya- Island 13 - Construction of Infra structure Civil & Building works

Client :
Ministry of Housing
consultant :
Cebarco
Scope :
All infrastructure Civil and building works including road works, street lighting, 11kv Power supply, low voltage power supply, storm water system, foul sewerage system, potable water supply, treated sewage efluent (TSE)/ irrigation system and telecom networks
Time Schedule
2015-2016

Structural Steel for Lexus parking building at Arad, Bahrain

Client :
E.K Kanoo
Final User :
Lexus Service Centre (E.K Kanoo group)
Scope :
Supply, fabrication, painting , delivery and erection of 145 tons of structural steel for Parking building of Lexus
Time Schedule
2015

Karranah Sewerage Scheme Blocks 746 & 460

Client :
Ministry of Works
consultant :
Ministry of Works
Scope :
construction of a sewerage network with 6.7 km lines, 425 Manholes & Chambers, reconstruction of 1 Lifting Station and 2 Pumping Stations and 350 House Connections plus 50m micro tunneling . Pipe sizes from 150mm to 500mm.
Time Schedule
2012-2015

2 Fives Solios Furnaces for GARMCO new casthouse

Client :
Fives Solios, France
Final User :
Gulf Aluminium Rolling Mill, Bahrain (GARMCO)
Scope :
Fabrication of 2 furnaces 100 tons each (weight including accessories) , full steel parts assembly in the shop and delivery of the furnaces under Fives Solios design for the expansion of Garmco new casthouse
Time Schedule
2016

Improvement of Salman Ahmed Al-Fateh highway in Sitra

Client :
Ministry of Works
consultant :
Ministry of Works
Scope :
Asphalt laying, paving bricks laying, storm water drainages, installation of crash barriers, kerbing, duct works, traffic signal works, road marking, removing and rerouting of existing cables, and services
Time Schedule
2012-2014

Bridge Maintenance

Client :
Ministry of Works
consultant :
Ministry of Works
Scope :
General Maintenance of bridges, culverts, drainage, channels, bridge parapet sections, signs gantries. It involves partial demolition and repair works of concrete head walls, piers, deck-slabs and wing walls, crack injection repair to existing concrete structure, protective coating to concrete surfaces, embankment protection with stone pitching…
Time Schedule
2014-2016

Structural Steel for Reef Island Club-House

Client :
Cyprus Cybarco Tabet JV, Bahrain
consultant :
Reef Island Club-House, Bahrain
Scope :
Fabrication, painting, supply and installation of steel structure
Time Schedule
2015